Kendall Bridge Rehabilitation Project

Period: September 2010 - May 2012
Contract: Kendall Bridge Rehabilitation Project, Southern Highway
Country: Belize
Employer: Government of Belize
Employer's Address: Ministry of Works
Power Lane,
Belmopan
Nature of Works:

- Removal of existing bridge sections and clear stream 50 m on both sides.
- Piling of Piers (48 No. H-beams)
- Construct abutments and deadmans.
- Placing and Stressing McAlloy tie-back from abutment to deadman.
- Construct temporary structure on which to assemble truss.
- Assemble Steel Truss Bridge – 90 meter span
- Double Carriage way – 3.500m traffic lane.
- Concrete Deck – 8.11 meter wide.
- Vehicle Barriers Assemble.
- Steel Truss – 90 meters long, 9.1 meters wide, 11.5 meters high
- Footpath.
- Construct raised road approach – 650 meters long.
- Paving, Signs, Footpaths, Guardrails, Painting.

Role: Sole Contractor
Total Value of Contract: US$5,949,540.00
Contract Awarded: 28 September, 2010
Period: 1 year 8 months
Completion Date: May 2012
Funding Agency: Caribbean Development Bank

Kendall-Bridge-Rehabilitation-Project

Description:

- Removal of existing bridge sections and clear stream 50 m on both sides.
- Piling of Piers (48 No. H-beams)
- Construct abutments and deadmans.
- Placing and Stressing McAlloy tie-back from abutment to deadman.
- Construct temporary structure on which to assemble truss.
- Assemble Steel Truss Bridge – 90 meter span
- Double Carriage way – 3.500m traffic lane.
- Concrete Deck – 8.11 meter wide.
- Vehicle Barriers Assemble.
- Steel Truss – 90 meters long, 9.1meters wide, 11.5 meters high
- Footpath.
- Construct raised road approach – 650 meters long.
- Paving, Signs, Footpaths, Guardrails, Painting.