Period: | September 2010 - May 2012 |
Contract: | Kendall Bridge Rehabilitation Project, Southern Highway |
Country: | Belize |
Employer: | Government of Belize |
Employer's Address: | Ministry of Works Power Lane, Belmopan |
– Removal of existing bridge sections and clear stream 50 m on both sides.
– Piling of Piers (48 No. H-beams)
– Construct abutments and deadmans.
– Placing and Stressing McAlloy tie-back from abutment to deadman.
– Construct temporary structure on which to assemble truss.
– Assemble Steel Truss Bridge – 90 meter span
– Double Carriage way – 3.500m traffic lane.
– Concrete Deck – 8.11 meter wide.
– Vehicle Barriers Assemble.
– Steel Truss – 90 meters long, 9.1 meters wide, 11.5 meters high
– Footpath.
– Construct raised road approach – 650 meters long.
– Paving, Signs, Footpaths, Guardrails, Painting.
Role: | Sole Contractor |
Total Value of Contract: | US$5,949,540.00 |
Contract Awarded: | 28 September, 2010 |
Period: | 1 year 8 months | Completion Date: | May 2012 | Funding Agency: | Caribbean Development Bank |
Description:
– Removal of existing bridge sections and clear stream 50 m on both sides.
– Piling of Piers (48 No. H-beams)
– Construct abutments and deadmans.
– Placing and Stressing McAlloy tie-back from abutment to deadman.
– Construct temporary structure on which to assemble truss.
– Assemble Steel Truss Bridge – 90 meter span
– Double Carriage way – 3.500m traffic lane.
– Concrete Deck – 8.11 meter wide.
– Vehicle Barriers Assemble.
– Steel Truss – 90 meters long, 9.1meters wide, 11.5 meters high
– Footpath.
– Construct raised road approach – 650 meters long.
– Paving, Signs, Footpaths, Guardrails, Painting.